Kiski – Wastewater Treatment Plant Upgrade

 

Project Description: Disinfection of Facilities 7.0 MGD activated sludge WWTP with primary and secondary wastewater treatment facilities.

KLH Engineers completed the design for the upgrade of the plant to increase peak treatment capacity in order to comply with Long-Term Control Plan requirements. A preliminary Basis of Design study included evaluation of upgrade requirements for: raw sewage pump station, headworks, secondary treatment, and disinfection. KLH evaluated secondary treatment alternatives including: conversion of the existing activated sludge process to modified Ludzack-Ettinger (MLE) including construction of new aeration tanks and secondary clarifiers, conversion of existing process to MLE and construction of a parallel sequencing batch reactor (SBR), and construction of an SBR for treatment of all flow. Design and construction of an SBR for all treatment was the selected alternative. The selection of this alternative allows for future conversion of the existing aeration tanks into additional aerobic digesters. KLH completed the design and bid phase services for the plant upgrade project, and is presently providing construction phase services.

The plant currently does not have nutrient limits, however the SBR design provides nutrient removal capacity at less than a five percent increase in project cost. Design limits are 5 mg/L and 1 mg/L for nitrogen and phosphorus respectively.

| Other Posts

| Events

KLH Excited to Attend Fall Conferences

KLH is excited to attend the following fall conferences: PMAA (September 11-14, 2022) WEFTEC (October 8-12, 2022) Washington County Association of Township Officials Annual Convention…

Read More

| News

Congratulations to Kevin Hoffman!

A huge CONGRATULATIONS and THANK YOU to Kevin Hoffman for 25 years with KLH Engineers! Prior to working here full-time, Kevin was an intern with…

Read More

| Other Posts

| Case Study, Water

Tracer Study at St. Marys Area Water Authority Water Treatment Plant

Tracer Study underway at the St. Marys Area Water Authority Water Treatment Plant! KLH is running a tracer study to determine a Baffling Factor for…

Read More

| "Blueprints" Blog

KLH Rolls Out New SCADA Team

KLH Engineers, Inc. services numerous Municipal and Water/Wastewater clients in Western PA. Recently KLH has rolled out a new team of engineers to provide system…

Read More

| Other Posts

| Events

A Fun Evening at the KLH Employee Outing

The KLH Annual Employee Outing was held on Friday, August 27th at PNC Park. KLH employees and their guests enjoyed a tailgate party before the…

Read More

| Events

2021 KLH Golf Outing a Success!

KLH held their 2021 Annual Golf Outing and dinner at Birdsfoot Golf Club in Freeport, PA on Friday, September 3rd. This annual event is hosted…

Read More

| Other Posts

| Case Study, Water

Erie Water Works

Project Description: The Cherry Street Pump Station, owned and operated by the Erie Water Works (EWW), collectively consists of three (3) pump stations including Cherry…

Read More

| Case Study, Water

Moon Township Municipal Authority

The Moon Township Municipal Authority (MTMA) Fern Hollow Water Treatment Plant Improvements Project included:  piping modifications to reverse flow through the old flocculation and sedimentation…

Read More

| Other Posts

| News

KLH Raises Money and Food for Greater Pittsburgh Community Food Bank

KLH Raised $1,100, and collected over 1,500 pounds of food for the Greater Pittsburgh Community Food Bank in 2021.

| Awards

Kevin Hoffman, 2021 PWEA Ted Haseltine Award Winner

KLH Engineers Inc. is proud to recognize our own Kevin D. Hoffman for being presented with the PWEA Ted Haseltine Award for 2021.  The esteemed…

Read More