| Municipal

North Huntington Township Paving

 

Project Description:

2012 Road Maintenance Program
North Huntingdon Townships’ $450,000 2012 Road Maintenance Program consisted of 18 roads totaling more than 3.5 miles in length. The Township used Pennsylvania Liquid Fuels funds to fund the project. KLH coordinated with PennDOT Municipal Services Specialist to secure all necessary approvals for funding.

The Township Public Works Department provided a list of prospective roads that needed to be rated and prioritized to efficiently use as much of the budget as possible. KLH Personnel surveyed all the prospective roads and developed preliminary designs and estimates for repair. Proposed repairs included cold milling, profiling, hot-mix asphalt overlay, chip seal, storm water inlet installation and micro-surfacing.

Once the final list was determined, KLH proceeded with a GPS field survey to use as a basis for the drawings. Contract documents and technical specifications were prepared and the project was put out for bid. KLH administered the bidding process and assisted North Huntingdon Township in identifying the lowest, responsible bidder.

Once construction began, KLH provided daily resident observation, using experienced and trained personnel, to immediately resolve all issues in the field and ensure compliance with contract specifications as well as PennDOT specifications.

| Other Posts

| Events

KLH Excited to Attend Fall Conferences

KLH is excited to attend the following fall conferences: PMAA (September 11-14, 2022) WEFTEC (October 8-12, 2022) Washington County Association of Township Officials Annual Convention…

Read More

| News

Congratulations to Kevin Hoffman!

A huge CONGRATULATIONS and THANK YOU to Kevin Hoffman for 25 years with KLH Engineers! Prior to working here full-time, Kevin was an intern with…

Read More

| Other Posts

| Case Study, Water

Tracer Study at St. Marys Area Water Authority Water Treatment Plant

Tracer Study underway at the St. Marys Area Water Authority Water Treatment Plant! KLH is running a tracer study to determine a Baffling Factor for…

Read More

| "Blueprints" Blog

KLH Rolls Out New SCADA Team

KLH Engineers, Inc. services numerous Municipal and Water/Wastewater clients in Western PA. Recently KLH has rolled out a new team of engineers to provide system…

Read More

| Other Posts

| Events

A Fun Evening at the KLH Employee Outing

The KLH Annual Employee Outing was held on Friday, August 27th at PNC Park. KLH employees and their guests enjoyed a tailgate party before the…

Read More

| Events

2021 KLH Golf Outing a Success!

KLH held their 2021 Annual Golf Outing and dinner at Birdsfoot Golf Club in Freeport, PA on Friday, September 3rd. This annual event is hosted…

Read More

| Other Posts

| Case Study, Water

Erie Water Works

Project Description: The Cherry Street Pump Station, owned and operated by the Erie Water Works (EWW), collectively consists of three (3) pump stations including Cherry…

Read More

| Case Study, Water

Moon Township Municipal Authority

The Moon Township Municipal Authority (MTMA) Fern Hollow Water Treatment Plant Improvements Project included:  piping modifications to reverse flow through the old flocculation and sedimentation…

Read More

| Other Posts

| News

KLH Raises Money and Food for Greater Pittsburgh Community Food Bank

KLH Raised $1,100, and collected over 1,500 pounds of food for the Greater Pittsburgh Community Food Bank in 2021.

| Awards

Kevin Hoffman, 2021 PWEA Ted Haseltine Award Winner

KLH Engineers Inc. is proud to recognize our own Kevin D. Hoffman for being presented with the PWEA Ted Haseltine Award for 2021.  The esteemed…

Read More